Replicon now sells exclusively as Deltek Replicon, with no published pricing anywhere on Deltek's site.

Put these three side by side and the label "time tracking software" stops meaning much. My Hours is a timer with a rate card attached: log the hour, set who it bills to, send a defensible invoice, done. Paymo is a project-management platform that happens to own time properly, with tasks, Gantt planning, resource scheduling, timesheets, and invoicing built so a five-person studio doesn't need a PM tool, a timer, and a billing app as three separate line items. Deltek Replicon is a different species entirely: compliance-grade time capture for large workforces, project accounting, and labour rules that change at every border, sold to organizations where the timesheet is evidence in an audit, not just a number on a report.

All three technically do "time tracking." Almost nothing else about them is comparable at face value, which is exactly why they keep landing on the same shortlist and confusing buyers who assume a bigger logo means a better fit. The real question isn't which tool has more features. It's which weight class your team is actually in: a freelancer's hours, an agency's whole operation, or an enterprise's audited billing. Get that placement wrong and you either overpay for compliance machinery you'll never touch, or underbuy a $9 timer for a job that needed an audit trail.

TL;DR

My Hours Paymo Deltek Replicon
What it really is A timer with billable rates and simple invoicing A work-management platform with time, tasks, and billing built in Enterprise time, labour compliance, and project accounting
Free tier Up to 5 active users, unlimited projects 1 user, 1 client, 2 projects None. Demo request only
Entry paid seat, monthly billing Basic, $5/user/month ($4 annual) Plus, $10.90/user/month promo ($15.90 regular) Not published
Where the real feature set lives Pro, $9/user/month ($8 annual) Pro, $16.90/user/month promo ($23.90 regular) Whichever module bundle Deltek quotes you
Genuinely stronger at Being cheap, honest, and simple to defend Owning the whole delivery loop: plan, do, track, bill Multi-country compliance, audit trails, workforce scale
Buying friction Almost none, self-serve in minutes Low, self-serve with a real trial High: demo, scoping call, procurement cycle
Best for A freelancer or small team that just needs defensible hours A small agency or studio replacing three subscriptions with one A professional-services or government-adjacent org under audit pressure

What Each Tool Is Actually Built For

My Hours has been running since 2002, and its own homepage leans on that longevity rather than hiding it: "your reliable time tracker since 2002." It states it has "helped 250,000+ people track their work" and that "100,000+ businesses make time tracking work with My Hours." Nothing about the product tries to be more than a timer with a billing layer on top. There's no monitoring, and My Hours says outright that it "does not include employee monitoring and never will." The natural buyer needs to answer one question defensibly: how many hours, on what, billed to whom.

Paymo's homepage calls itself "the go-to platform for independent professionals and small teams to manage client work, track billable hours, and send invoices," claiming it's "trusted by 100,000+ independent professionals and small teams." The pitch is explicitly about collapsing tools: "simplify how you manage projects, track billable hours, and send invoices in a single connected system." That's a different sale than My Hours makes. My Hours assumes you already have a project tool and just need the timer and the invoice. Paymo assumes you don't want three subscriptions and would rather have one product that does tasks, Gantt charts, resource scheduling, timesheets, and billing together.

Deltek Replicon doesn't have a comparable homepage pitch, because it doesn't have a self-serve homepage at all anymore. Deltek describes it as "an AI-powered time tracking application that gives professional services firms the clarity and control they need to manage labor costs, accelerate billing, and maintain compliance across a global workforce," sold as part of Deltek's Work Intelligence line inside its broader project-based ERP portfolio. The product ships as modules: TimeBill for project time and client billing, Workforce Management for attendance, scheduling and kiosk clock-in, Expense Tracking, and Global Leave Management for multi-country PTO and statutory accrual rules. Nobody buys Replicon for a better timer. They buy it because a timesheet at their scale is a legal record, not a convenience.

My Hours Paymo Deltek Replicon
Buying trigger Freelancing or running a lean team and needing billable proof, not a PM suite Juggling a PM tool, a timer, and an invoicing tool as three separate bills An audit, a government contract, or a multi-country workforce made "quote-only" the wrong objection
Usual champion The freelancer or ops-minded owner who sends the invoice An agency principal or studio lead tired of stitching tools together A controller, compliance lead, or professional-services CFO
Wins the demo on "This is all I actually needed" "This replaces three of my subscriptions" "This survives external review"
Loses the demo on Any PM depth, or any compliance depth Enterprise-scale approval chains and statutory leave Literally showing you a price on the page
Fits best Solo consultants, boutique studios, small project teams Small agencies and studios, roughly 5 to 30 people Professional-services and government-adjacent firms, roughly 100-plus people

Key Facts

  • Billable utilization across professional services organizations fell to 66.4% in 2025, the lowest point in SPI Research's survey history, according to the 2026 Professional Services Maturity Benchmark, published by Deltek, the same company that now owns Replicon.
  • Government contractors must record time daily, keep a change history showing who edited an entry and when, and retain supporting records for roughly three years after final contract payment, per Cherry Bekaert's summary of DCAA timekeeping requirements.
  • Under the Fair Labor Standards Act, US employers must preserve payroll records for at least three years and keep basic time cards for at least two years, per the Department of Labor's recordkeeping fact sheet.
  • Missing or incorrect time punches cost roughly $78,700 per year per 1,000 employees, with the average company running an 80% payroll accuracy rate and 15 corrections per pay period, per an EY analysis of 508 HR and payroll professionals (HR Dive, citing EY).

Decision by Business Goal

Business goal Best fit
"I need one honest number for what I billed this month, nothing more" My Hours
"I want to stop paying for a PM tool, a timer, and an invoicing app separately" Paymo
"Our timesheets have to survive an external audit years from now" Deltek Replicon
"I bill a handful of clients and want Gantt charts for the bigger projects" Paymo
"I need multi-country statutory leave rules handled correctly" Deltek Replicon
"I'm testing whether time tracking is even worth paying for yet" My Hours (free up to 5 users)
"Procurement can't run a demo-gated purchase this quarter" My Hours or Paymo

Team and Role Fit

Role My Hours Paymo Deltek Replicon
Freelancer / solo consultant Strong: exactly the job it's built for Workable, but PM depth goes unused Wrong tool entirely
Agency owner / studio lead Workable for a very small team Strong: one login for delivery and billing Overbuilt, and the buying process alone is a mismatch
Finance / controller Basic billable-rate reporting Budget versus actual by project Strong: built for exactly this seat
Compliance / audit lead No real audit-trail depth Limited, approvals arrive late (Pro tier) Strong: the whole product is built around this role
HR / people ops Not applicable Not applicable Strong: Global Leave Management module
Project or resource manager Not applicable, no PM layer Strong: Gantt, Kanban, workload view Workable, project-costing rather than delivery-planning

Project and Task Depth: The Line That Actually Separates My Hours From Paymo

This is where My Hours and Paymo stop looking like the same category, even though both show up on "cheap time tracker" lists. My Hours tracks time against a project and a client and stops there. There's no task board, no Gantt chart, no resource-workload view. That's a deliberate scope decision, not a missing feature: the product exists to answer "how many hours, billed to whom," and every screen serves that one job.

Separate Time Records From Work Planning: For My Hours, Paymo and Deltek Replicon, test where tasks, project plans and cost codes belong in your operating model.

Paymo builds the timer on top of a real project-management core. Tasks carry a spreadsheet view, a Kanban board, and recurring-task support even on its entry paid tier. Gantt charts arrive at task level on Plus and expand to full portfolio Gantt on Pro, alongside employee scheduling, workload management, and leave management. A studio using Paymo isn't buying a timer with extra steps. It's buying the planning layer a PM tool provides, with time and billing already wired into the same tasks instead of synced in from a second app.

Replicon doesn't compete on either axis. Its "project" concept is a cost object for labour compliance and client billing, not a place to plan work. TimeBill handles project time capture, bill rates, client invoicing, and revenue recognition; actual delivery planning for firms that need it sits elsewhere in Deltek's project-based ERP tools.

Capability My Hours Paymo Deltek Replicon
Task list / Kanban board No Yes, from Free tier up Not the product's job
Gantt chart No Task-level (Plus), portfolio (Pro) No, delivery planning sits elsewhere in Deltek's ecosystem
Resource / workload scheduling No Yes, Pro tier Yes, inside Workforce Management
Recurring tasks No Yes Not applicable
Time logged against a task vs. just a project Project-level only Task-level Project and cost-code level
Proofing / file versioning No Yes, Plus and up No

Billable Rates, Budgets, and Getting Invoices Out

All three separate a cost rate from a billable rate, which matters more than it sounds: without it, you can only see whether a project is billed, not whether it's actually profitable. Where they diverge is what happens after the rate is set.

My Hours keeps this simple on purpose. Rates apply per project or per user, reports show billable versus non-billable hours cleanly, and Pro adds rate and budget calculations plus invoice generation. There's no retainer engine, no multi-currency handling, and no automated payment collection. It produces a number and a document, and you take it from there.

Paymo runs the fuller agency loop. Time and expenses roll into an invoice from inside the same project the task lived in, budgets track against actuals in real time, and Pro adds portfolio-level views across every active engagement. It's not as deep as Harvest on the invoicing side (no native Stripe or PayPal collection built the same way), but it doesn't need to be, since the same platform already holds the project and the task the invoice is billing for.

Replicon's billing sits inside TimeBill specifically: bill rates, client invoicing, and revenue recognition at a scale where "which client, which contract, which currency" is a real question, not an edge case. Revenue recognition in particular is not something either of the other two tools claims to do, and it's the clearest signal of who Replicon is actually built for: finance teams reporting revenue against contracts, not agencies sending a monthly invoice.

Capability My Hours Paymo Deltek Replicon
Billable vs. cost rate Yes Yes Yes
Rate by project / user Yes, Pro Yes Yes, plus contract-level rates
Budget tracking against actuals Basic (Pro) Real-time, project and portfolio Yes, with revenue recognition
Invoice generation Yes, Pro Yes, from tracked time and expenses Yes, via TimeBill
Online client payment collection No Not native Not the product's focus
Retainer / fixed-fee handling No Via project budget types Yes, contract-based
Multi-currency invoicing No Not a stated feature Yes

Approvals, Locking, and Audit Trails

This is the section that actually justifies Replicon's price tag, whatever that price turns out to be. A timer answers "how long did this take." A timesheet that survives an audit has to answer who submitted it, who approved it, whether it can still be edited, and whether there's a reason code on file for the one Tuesday that got amended six weeks later.

Make a Timesheet Defensible: Test My Hours, Paymo and Deltek Replicon with one amended entry. Trace submission, approval, locking and the reason for change.

My Hours has approval workflows with audit logs, but only on Pro, and they're built for a small team's sign-off, not a regulator's review. There's no reason-code requirement, no configurable multi-level routing, and nothing suggesting the product targets government-contract-grade retention.

Paymo's timesheet approvals arrive even later in its ladder, on Pro alongside leave management, and they're a single-step sign-off: a manager approves a submitted week. That's enough for a 15-person studio's payroll process. It is not enough for a firm that needs a second approver, a locked period nobody can quietly reopen, or a change history that would hold up if someone asked who changed an entry, and why, two years later.

Replicon is built around exactly that question. Configurable multi-level approval chains, reason codes on late or amended entries, daily-entry enforcement, and an audit trail designed for external review are the actual product, not an add-on module. That's the honest reason the other two tools can't simply add a feature and compete here: the entire data model is different when every entry assumes someone might have to defend it years later.

Capability My Hours Paymo Deltek Replicon
Timesheet approval workflow Pro tier, single-step Pro tier, single-step Configurable multi-level chains
Reason codes on amended entries No No Yes
Period locking after approval Not a named feature Not a named feature Yes
Full audit / change log Audit logs, Pro Basic history Built for external audit review
Daily entry enforcement No No Yes
Granular permissions Pro Not a stated depth Yes, role and jurisdiction-based

Multi-Currency, Multi-Entity, and Global Labour Rules

Here the gap stops being about feature depth and becomes a different product category. Neither My Hours nor Paymo publishes multi-currency invoicing or statutory leave handling as a feature, and that's not an oversight. It's simply outside the job either product was built to do. A five-person studio billing three clients in one currency has no reason to pay for the machinery this section describes.

Map the Rules by Entity: List countries, currencies and leave policies before scoping the system. Confirm which rules need configuration and who maintains them.

Replicon's Global Leave Management module exists specifically because a workforce spread across a dozen countries needs PTO accrual rules that differ by jurisdiction, and getting that wrong is a compliance problem, not a UX complaint. Combined with Workforce Management's multi-entity attendance and scheduling, Replicon is the only one of the three that can honestly answer "we have people in Germany, Singapore, and Brazil, and their leave accrues differently" without bolting on a second system.

Capability My Hours Paymo Deltek Replicon
Multi-currency billing No Not a stated feature Yes
Multi-entity structure No No Yes
Statutory leave / PTO accrual by country No Basic leave management (Pro) Yes, Global Leave Management module
Labour-law rule configuration by jurisdiction No No Yes
Kiosk / shared-device clock-in No No Yes, via Workforce Management (CloudClock)

If your actual gap is leave management alone, not the full Replicon suite, a narrower tool built specifically for absence and multi-currency reporting is worth a look before you commit to an enterprise quote. It's the one honest carve-out in this comparison: paying for all four Replicon modules to get the use of one is expensive plumbing.

Integrations and Accounting Sync

Integration My Hours Paymo Deltek Replicon
Accounting sync Not a native, named integration QuickBooks and Xero connections available Part of Deltek's broader ERP ecosystem
Project tools Basic integrations (Zapier-class) Native: it is the project tool Deltek's own project-based ERP suite
Calendar Limited Yes Not the product's focus
API access Yes Yes, Plus and up Yes, enterprise integration layer
Payroll export Basic Not a headline feature Deep, built for the buyer's payroll and HR stack

Read that table for what it implies rather than what it lists. My Hours and Paymo both assume you're plugging into tools you already run. Replicon assumes you're plugging into Deltek's own ecosystem, or a payroll and HR stack big enough to justify custom integration work. None of that is wrong, it's further evidence of the weight-class problem: a five-person studio doesn't have an "ERP ecosystem" to plug into, and a 400-person professional-services firm isn't going to route its statutory leave rules through a general automation connector.

Pricing at 5, 20, and 100 Users

My Hours publishes a flat per-user rate with no seat minimum. Free covers up to 5 active users. Basic is $5 per user per month billed monthly, or $4 per user per month billed annually. Pro is $9 per user per month billed monthly, or $8 per user per month billed annually. Enterprise is custom, and teams of 50-plus qualify for additional payment options (My Hours pricing).

Expose the Quote Assumptions: Confirm regular rates, user scope, required modules and renewal terms. Keep promotional and custom quotes separate from annual budgets.

Paymo prices Solo as a single-user plan and Plus/Pro per user with no published seat minimum. Free covers 1 user, 1 client, 2 projects. On monthly billing, Solo is $9.90 a month regular, currently promoted at $5.90 for the first 3 months for new customers; Plus is $15.90 per user per month regular, promoted at $10.90; Pro is $23.90 per user per month regular, promoted at $16.90. Paymo's pricing page separately states that paying annually saves up to 40% off the regular rate, but doesn't publish the exact resulting per-seat figure, so the table below prices Paymo on its confirmed monthly-billing rate times 12, a conservative ceiling: paying annually will land lower than this, by an amount Paymo doesn't spell out on the page itself (Paymo pricing).

Deltek Replicon publishes no price at any tier. Both of its former standalone pricing pages now redirect into Deltek's product page, which carries no figures at all, only a demo request. Any per-user number still circulating for "Replicon" online is reading a page that no longer exists. There is no honest way to fill in a 5, 20, or 100-seat figure here, and doing so would be the exact mistake this comparison exists to prevent.

Seats My Hours Basic (annual billing) My Hours Pro (annual billing) Paymo Plus (monthly billing x12, promo) Paymo Plus (monthly billing x12, regular) Paymo Pro (monthly billing x12, regular) Deltek Replicon
5 $240/year $480/year $654/year $954/year $1,434/year Quote only
20 $960/year $1,920/year $2,616/year $3,816/year $5,736/year Quote only
100 $4,800/year $9,600/year $13,080/year $19,080/year $28,680/year Quote only

The math: My Hours at $4 and $8 per user per month, its own published annual-billing rate, times 12 months times seat count. Paymo's figures use its published monthly-billing rate (promotional and regular) times 12; treat these as a ceiling, since Paymo states annual prepayment saves a further "up to 40%" without publishing the exact resulting number.

Two things worth pricing in beyond the table. First, Paymo's Solo tier is a trap at any seat count above one: it's single-user by design, covering 5 projects and 3 clients for that one person, so a 5-person team is already shopping Plus, not Solo, regardless of how the marketing page orders the tiers. Second, treat every Replicon number you find elsewhere, on a review site, a competitor comparison, or an old bookmark, as expired. It's citing a page Deltek took down.

Implementation and Change Management

Factor My Hours Paymo Deltek Replicon
Time to first tracked hour Minutes, self-serve signup Same day, self-serve with a real trial Weeks to months, demo and scoping required
Who needs training Almost nobody A short onboarding for the PM features Admins, approvers, and often a change-management plan
Procurement involvement None, card checkout None, card checkout Real: contracts, security review, possibly a pilot
Migration complexity Low, it's a narrow tool Moderate, if replacing a separate PM tool too High, especially replacing an incumbent enterprise system
Ongoing admin load Minimal Light, mostly project and rate setup Real: rule configuration per entity and jurisdiction

Be honest about what that last row costs, because it's the part enterprise buyers underweight going in. Replicon isn't slower to deploy because the software is worse. It's slower because the configuration work, mapping approval chains, leave policies, and cost codes to how your organization actually runs, is the product doing its job correctly. A vendor that let you skip that step would be selling you a timer wearing a compliance costume.

Budget for Configuration Work: Compare My Hours, Paymo and Deltek Replicon using your actual migration, approval and administration requirements, not signup speed alone.

Risk and Governance

Concern My Hours Paymo Deltek Replicon
Wage-and-hour recordkeeping Basic reports, no stated retention policy Basic reports, no stated retention policy Built to retain records for external audit
Government-contract (DCAA-style) readiness No No The category it's built for
Data residency / self-hosting No No Available at enterprise scale
Vendor lock-in risk Low, easy to export and leave Low to moderate, once tasks and Gantt data are in it High, once workflows and integrations are built out
Typical contract length Month-to-month available Month-to-month available Typically annual or multi-year

The FLSA already requires US employers to keep payroll records for at least three years and time cards for at least two, regardless of which tool you use, so that baseline applies whether you're on My Hours or Replicon. What changes is who's actually responsible for proving it. A five-person studio on Paymo can export a CSV and call it done. A government contractor cannot, which is exactly the DCAA requirement for daily entry, a change history, and roughly three years of retention after final contract payment described above, and it's why "we'll export it if anyone asks" stops being an acceptable answer somewhere between those two extremes.

When My Hours Is the Right Call

  • You're a freelancer or a small team that needs one honest, defensible number for what you billed this month, nothing more
  • You don't want to pay for project planning, Gantt charts, or compliance depth you'll never open
  • Procurement friction has to be zero: no demo, no call, just a signup
  • You want to pilot time tracking free with up to 5 people before deciding whether to pay for anything at all

When Paymo Is the Right Call

  • You're a small agency or studio currently paying for a PM tool, a separate timer, and a separate invoicing app, and you'd rather have one login
  • Gantt charts, resource scheduling, and a task board matter as much as the timer itself
  • Your team is roughly 5 to 30 people: small enough that Replicon-grade approval chains would be theater, big enough that My Hours' bare-bones scope leaves work on the table
  • You want time tracked at the task level, inside the same record as the project plan, not synced in from a second app

When Deltek Replicon Is the Right Call

  • Your timesheets are evidence: a government contract, an external audit, or a regulator could ask to see them years from now
  • Your workforce spans multiple countries with different statutory leave rules, and "we'll handle it in a spreadsheet" already failed once
  • You run multi-entity or multi-currency project accounting where revenue recognition has to tie back to logged time
  • You have the internal capacity, or the budget for a partner, to run a real implementation instead of a signup

If None of the Three Fits

Some teams work through all of this and land in between: too much complexity for My Hours, not enough delivery depth in Paymo, and nowhere near the scale that justifies a Replicon procurement cycle. That gap is real, and it usually means the actual requirement is narrower than "time tracking" implies, like leave management alone or client billing alone, rather than the full weight of any of these three products.

It's also worth naming plainly where none of these three go at all: hours that live on the same record as a CRM deal or a cross-team Work Ops project, not just a task. Rework's Timesheet module does that, as part of its broader People app, but it has no free tier and isn't trying to out-simplify My Hours or out-plan Paymo. It's a different shape of answer for teams already consolidating operations onto one platform, priced per organization rather than published (see rework.com/pricing for the lines Rework does publish).

If the real question is billing depth without Paymo's PM layer, Toggl Track vs Harvest and Best Harvest Alternatives cover that fight directly. If what you want is time embedded inside a PM tool you already run, rather than a PM tool with time built in, Best Everhour Alternatives covers that narrower angle. If it's the PM layer itself you're after, without time tracking bundled in, Best Project Management Software in 2026 and how to choose project management software are the better starting points. And if Replicon's compliance depth is right but the quote-only sales process isn't, Best Replicon Alternatives covers 14 priceable options at that end of the category, several of which handle global leave and audit trails without the demo gate.

Decision Framework

If you are... Pick
A freelancer or tiny team needing a defensible, uncomplicated number My Hours
Paying for a PM tool, a timer, and an invoicing app as three separate bills Paymo
Running project delivery and billing inside one small-team platform Paymo
Facing a government contract or external audit of your time records Deltek Replicon
Managing statutory leave across several countries Deltek Replicon
Piloting time tracking for free before committing budget My Hours (free to 5 users)
Wanting hours tied to the same record as a CRM deal or cross-team project Rework (see rework.com/pricing)
Still narrowing the category down See the best time tracking software roundup

The verdict: these three don't compete for the same budget, and that's the actual finding here. My Hours wins on being cheap and honest about what it is. Paymo wins if your team's real problem is three disconnected subscriptions rather than a missing timer. Replicon wins the moment your timesheet has to survive being questioned by someone outside your company, at which point price stops being the first question anyway.

What to Do Next

  1. Name your weight class before you compare features. A freelancer evaluating Replicon and an audit-exposed firm evaluating My Hours are both about to waste a quarter.
  2. Run My Hours or Paymo free before paying anything. Both have a real self-serve tier; there's no reason to skip straight to a paid plan on either.
  3. If Replicon is genuinely in scope, get a written quote early, and ask specifically which of the four modules (TimeBill, Workforce Management, Expense Tracking, Global Leave Management) you actually need, since paying for all four to use one is the most common overspend in this category.
  4. Price Paymo at its regular monthly rate, not the 3-month promotional one, when budgeting past year one, then ask directly for the annual-prepay figure, since Paymo doesn't publish it.
  5. Still comparing the wider field? Best Time Tracking Software in 2026 and Best Timesheet Software in 2026 cover the full 16-tool category, and Best HR Software in 2026 is the better starting point if leave management, not time tracking, turns out to be the real gap.

Related Resources:

About the author

Kevin Kim

Kevin Kim

Senior Customer Retention Strategist

Kevin Kim is Senior Customer Retention Strategist at Rework, writing for HR leaders and people managers on growing their people. Kevin covers job descriptions and role design, employee competencies, and organizational competency frameworks: the building blocks for hiring the right people and developing them once they join.